MSAPMOHS401A - Assess risk
Description |
On completion of this unit, the worker will be able to identify hazards and operability problems and then analyse them by hazard analysis techniques to assess risk. |
Pre Requiites |
Nil |
Application |
A team with a broad knowledge of the system and its operation will carry out the analysis. It is expected that the risk assessment processes are already defined for the enterprise and that the risk acceptance criteria have already been established. The team will be steered by engineering experts or risk assessment specialists in the industry. This competency applies to workers who, in a typical scenario, take an active role in a HAZOP or similar methodology. They are not expected to lead the HAZOP. This unit is not restricted to HAZOPs and may be applied to other methodologies requiring similar competency. The risk assessment should be consistent with AS 4360 - Risk Management. |
Performance Criteria |
1. Identify hazards and potential operability problems. 1.1 Contribute to the compiling of a system description of all the machinery, equipment, operations, products and materials relevant to the everyday working procedures of the facility. 1.2 Contribute to the compiling of a checklist containing process parameters (primary key words) and guide words (secondary key words) relevant to the system. 1.3 Identify hazards, existing control measures and potential operability problems or breakdowns in control measures using the compiled system descriptions and the checklist. 2. Assess impact of risk and determine alternative strategies. 2.1 Screen for causes of deviations and establish consequences. 2.2 Determine alternative strategies for action in relation to each deviation within the range of competency and responsibility. 2.3 Review, clarify and/or analyse risk information to determine its relevance and reliability depending upon the task assigned, level of competency and area of responsibility. 3. Assess risk information against established risk criteria in risk management plan. 3.1 Check risk acceptance criteria for any changes over past period. 3.2 Compare risk information against risk acceptance criteria and procedures to assess acceptability of risk. 3.3 Conduct liaison with other Internal departments to assess impact on business if applicable. 3.4 Document findings according to company policies and procedures. 4. Develop a risk register. 4.1 Develop a risk assessment chart for each system studied containing deviation, cause, consequence, control measures and action. 4.2 Develop action plan for implementation of control measures, including any changes to procedures. 4.3 Establish or review the procedures by consulting relevant/different work groups. 4.4 Inform relevant work groups of any changes and implement, within area of responsibility, changes in the procedures. 4.5 Monitor effectiveness of the control measures including revised procedures. 5. Establish and maintain procedures for identifying hazards, and assessing and controlling risk. 5.1 Identify and develop procedures for routine hazard identification, assessment and control of risks. 5.2 Address identification of all hazards at the planning, design and evaluation stages of any changes in the workplace to ensure that new hazards are not created by the proposed changes. 5.3 Develop and maintain procedures for selection and implementation of risk control measures in accordance with the hierarchy of control. 5.4 Identify inadequacies in existing risk control measures in accordance with the hierarchy of control and, within area of responsibility, promptly provide resources enabling implementation of new measures. |
Required Skills & Knowledge |
The requirements of the relevant OHS act and regulations with regard to risk assessment should be known and followed. Knowledge includes:
Language, literacy and numeracy requirements This unit requires the ability to interpret process plant descriptions and drawings. Writing is required to the level of making the required reports for the process. Numeracy is required to interpret hazard and probability data and determine risk profiles. |
Range Statement |
Context This unit will be completed as a specialist unit (eg by plant technicians) requiring technical knowledge. The aim of this competency unit is to apply a methodical examination of the system and its elements to identify hazards and the states or conditions where there may be loss of control of the hazard and the resultant consequences The results of the hazard analysis should be expressed clearly and concisely, and include where possible tables and diagrams. Team members would contribute their understanding of the process and particularly the operational aspects, and then carry out whatever tasks are assigned to them by the analysis team. While this competency aims to enable a person to identify hazards and assess risk through a systematic approach, more than 80% of recommendations can be operability problems and are not, of themselves, hazards. Although hazard identification should be the main focus, operability problems should be identified to the extent that they have the potential to lead to a breakdown in hazard controls resulting in a health, safety or environmental violation or have a negative impact on profitability. The degree of depth of a checklist should be dependent on the knowledge of the system at the time the study is carried out. This technique can therefore be applied at any stage of the project/process lifecycle. Screening for deviations includes accessing internal and external data that may provide information about previous incidents or warnings of incidents. Sources of such information may include:
Procedures All operations are performed in accordance with procedures. Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards. Hazards Typical hazards include:
Problems Typical process and product problems may include:
Process Parameters Specific process parameters (primary key words) relevant to the system may include:
|
Evidence Guide |
Overview of assessment
Assessment method and context
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed. Specific resources for assessment This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required. Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
|
- Courses
- Units of Competency
Traning
- Adult Education Principles
- Aviation Consultancy
- Competency Mapping
- Course Design
- Customised Training
- Emergency Evacuation Plans
- Escorted Entries
- Gap Analysis
- Job & Competency Profiling
- Mentoring
- Premium Support
- Procedures Development
- Risk Management
- Quality: Continuous Improvement
- Training & Assessment Systems: Evaluation and Analysis
- Training & Assessment System Development
- Training Needs Analysis
Services
Copyright © 2011Risk Response + RescueAll Rights Reserved Terms & Conditions Disclaimer Privacy PolicyImprint